Our achievements
Idea
Engineering study
Construction
Delivery
* Acronym:
AEP: Potable water supply
AEPP: Pumped potable water supply
AEPG: Gravity-fed potable water supply
2023
- Solar Parc Construction Ambalanirana (AGT)
- Water drilling CR Ivato Firaisana, Ambohidratrimo, Analamanga (APC)
- Water drilling CR Ivato Andriantany, Ambohidratrimo, Analamanga (APC)
2022
- AEPG Ambodimotso (atchment, reservoir, conveyance, and distribution, 136 social connections) (CRS)
- AEPG Anjiamangirana (Catchment, reservoir, conveyance, and distribution, 112 social connections) (CRS)
- Water drilling Rangaina, Analamanga (GENCOM)
- Water drilling Ambohinanaka, Analamanga (GENCOM)
- Water drilling Ambatofotsy, Analamanga (GENCOM)
- Solar Parc construction Mahavelona (AGT)
2021
- AEPP Amboditandroho, Mahatsara, Mahasoa ( Elevated reservoirs 50m3, 3 boreholes, 3 wells with conveyance and distribution, 120 social connections) (CRS)
- Construction of irrigated perimeter and crossing structure CR Miary, Tuléar district (UNICEF)
2020
- Building construction R+2 (Private client)
- Pool construction (Private client)
2019
- Pipeline Ampotaka Upgrading: Doubling of pipeline over 56.544km and rehabilitation of hydraulic equipment between Ampotaka-Sampeza and Antanamalangy-Tsihomobe (UNICEF)
-
Ampotaka Pipeline Upgrade: Installation of new pipeline over 27.856 km between Soaramena and Faux-Cap (UNICEF)
2018
- Building construction de Maintirano, Région Melaky (FORMAPROD/VOLASOA)
2017
- AEPG Ambinaninony, commune Vohitranivona, District Brickaville, Région Atsinanana (CRS)
- Building construction R +2 Hotel (Private customer)
2016
- AEPP Mahafasa, Elevated 40M3 reservoir, 10m high, Farafangana District, Atsimo Atsinanana Region (UNICEF)
- AEPG Midongy sud, district Midongy sud, Région atsimo Atsinanana (UNICEF)
- AEPP Manambotra Sud, réservoir 30M3 15m high, District Farafangana, region Atsimo Atsinanana (UNICEF)
- Sanitary block construction SAHAFANIO (WATERAID)
- AEPG construction lfarantsa , réservoir 40M3, Taolagnaro Région Atsimoandrefana (UNICEF)
- AEPP system construction of Manasoa (Drilling Shelter, Elevated 100m3 reservoir, 15m high, Distribution Pipeline, Distribution Point) (UNICEF)
- AEPG construction Ranomena,
district Vaingand rano, Région
Atsimo atsinanana (UNICEF)
2015
- AEPG construction of Mandiso , réservoir 20M3 , Taolagnaro Région Atsimoandrefana (UNICEF)
- AEPG construction of Nosifeno Midongy du sud Région Atsimo Atsinanana (UNICEF)
- AEPG construction of Taviala Ankaramena, Distict Tolagnaro, Région Anosy (UNICEF)
- AEPG construction of Ranopiso, Distict Tolagnaro, Région Anosy (UNICEF)
- Construction of a 5-compartment sanitary block for CEG Tanjombato (WATERAID/WSUP)
-
Upgrading for AEP detention center of Antanimora (2 superimposed reinforced concrete reservoirs of 30 m3 each elevated at 7m + submersible pump + distribution) (CICR)